Featured Projects

Gold's Gym


altGold's GymHanover, PA

Description:

Construction of new 33,000 SF Fitness Center

Project Manager/Project Superintendent/Estimator:

Chris Keller / Shane Tawney / Chris Keller

Milestones:

With minimal experience in the health club business, Dr. Scott Rankin, was highly recommended Premier Construction to entrust to build this dream project for his family to operate.

A full service Design/Build project, Premier worked with Mr. Rankin from project inception offering budget costing, conceptual design, and working through painstaking municipality zoning approvals. We evolved the conceptual project into reality by offering full service design documents, obtaining all necessary permits, then completion of construction of this beautiful new building.

The project was completed within the scheduled eight month time period and under the original budget presented long before design documents were completed. The finished parking lot area contained 275 parking spaces and a long system of storm water management. All interior finishes meet the high expectations that Gold's Gym require of their franchisees. Premier Construction Group is proud to have played a key role in making this project a successful business in the Hanover Area.


MOD Pizza


altMOD PizzaWest Manchester Mall, York, PA 17402

Description:

Construction of a new 3,000 SF restaurant

Estimator / Superintendent / Project Manager:

Jared Siminitus / Tim Wirt / Chris Keller

Milestones:

Project involved construction of new 3,000 square foot +/- restaurant from an empty shell.

Installation of:

  • Mechanical, electrical and plumbing systems
  • All kitchen equipment
  • 7k pound pizza oven (800° F)
  • Walk-in refrigeration
  • Custom interior finishes
  • Furnishings including the casework and seating package, and exterior seating areas with railings and lighting

Metro Bank


altMetro BankEast Lampeter, Lancaster, PA

Description:

6-month construction schedule. New out of the ground steel framed 3,200 SF branch bank, with three drive-thru lanes.

Estimator / Superintendent / Project Manager:

Mark Sather / Christopher Keller / James Drank

Milestones:

6-month construction schedule. New out of the ground steel framed 3,200 square foot branch bank, with three drive-thru lanes. An extremely high profile project with exquisite finishes including polished stainless steel throughout, Italian marble flooring, granite teller line, and neon lighting. The drywall framed ceilings contain pointed stars, radius bulkheads, all at multiple elevations.


Messina Highlands, Retail Center


altMessina Highlands, Retail CenterShrewsbury, PA

Description:

Design and Construction of a 36,000 square foot Retail Center

Architect / Estimator / Project Manager:

Eric Eshbach / Mark Sather / Christopher Keller

Milestones:

From its inception this was going to be unique and very different from the other retail centers in the area. For the buildings, an industrial look with a small town feel and a modern edge was desired. This was accomplished by using traditional materials, large expanses of storefront, and creating individual unique facades throughout. The project rests on top of a hill with fantastic views of the surrounding country side which would make the grading, parking and utilities a challenge.

Our construction management team brought our expertise to bear on this project, which is still under construction and due to be completed in early2015. We coordinated with the owner's civil engineer to fit the parking, buildings and landscaping onto a tight site. The buildings are being kept within budget as we worked to maintain the architectural elements with sensitivity to the cost and constructability. Lastly the schedule is being maintained as we complete complex tenant fit-outs, incorporate owner requested revisions, weather and various challenges. All in all everyone is pleased and we could not have asked for a better project to showcase our talents and commitment to our industry and clients.


NxStage Baltimore West


altNxStage Baltimore West809 Pinnacle Drive; Units A-C
Linthicum Heights, MD 21090
Anne Arundel County

Description:

Kidney Dialysis Clinic Fit-Out

Estimator / Superintendent / Project Manager:

Mark Sather / Brian Kunselman / Timothy D. Lerew

Milestones:

Beginning with an empty shell space in a new building, this suite was transformed into a high-class dialysis clinic. At approximately 7,300 SF, this clinic includes six (6) treatment stations on the main floor, five (5) training rooms and one (1) isolation room. The main storage room made use of an existing overhead door for easier material deliveries. Finishes included luxury welded sheet vinyl, ceramic tile with accents and boarders, Korogard wall protection, custom stained solid core wood doors, a RAYDOOR feature between two of the training rooms, solid surface counter and work tops, custom stained crown moldings and two-piece chair rail trims. The waiting area included an electric fireplace, custom laminate wainscot panels and there is radius crown molding installed throughout the clinic.